IBRD Loan: US$225 million
Terms: Maturity = 24.5 years; Grace = 9 years
Project ID: P117323
Project Description: The objective of the project is to meet growing demand and improve the reliability of electricity supply in Java and south-central Sumatra by strengthening the electrical power transmission systems.