Skip to Main Navigation
Events

World Bank Tokyo Online Morning Seminar #207 “Senegal Dakar Bus Rapid Transit System (BRT) Pilot Project”

December 11, 2024
Tokyo, Japan

The development objective of Dakar Bus Rapid Transit Pilot (BRT) Project for Senegal to enhance urban mobility between Dakar and Guédiawaye through the development of a Bus Rapid Transit (BRT) corridor.

 

This project has four components:

1) The first component, BRT Infrastructure, Fleet, and Systems, aims to finance goods, works, and services for detailed design, construction, and supervision of the BRT core infrastructure including the road infrastructure and its drainage system, landscaping, depot, terminals, stations, intersections, corridor traffic management systems, pedestrian crosswalks, sidewalks, and some bike lanes along the corridor.

2) The second component, Public transport network restructuring and road works, aims to finance goods, works, and services for road works along feeder routes, road works on vicinal roads to support diverted traffic due to suppressing of left turn movement as well as reduction of the ROW, and provision of urban furniture for public transport along feeder routes.

3) The third component, Capacity building and project management, aims to finance provision of technical assistance, operational costs, and capacity building in project implementation as well as in sustainable monitoring and supervising of BRT operations (including a mirror system), fiduciary and safeguard activities, monitoring and evaluation (M and E), and financial audits.

4) The fourth component, Road safety, aims to finance provision of road safety technical assistances, education and sensitization campaigns of local communities to the BRT operations, and training and equipment.

A new BRT system in Dakar was launched in January 2024, making it the first all-electric BRT system on the African continent, generating a combination of socioeconomic benefits that will contribute to a more livable city .

At this online seminar, the project’s task team leader, Franck Taillandier, Lead Transport Specialist, West and Central Africa Region, introduced the project.  

Speaker:

Franck Taillandier
Lead Transport Specialist, West and Central Africa Region, World Bank

Presentation Material:

Implementing the first electric BRT in Africa The Dakar BRT Project (PDF)

 

Related Seminars

World Bank Group Morning Seminar

 

 

 

Event Details

  • DATE/TIME: 8am-9am, Wed, December 11, 2024 (Japan Standard Time)
  • FORMAT: Online (Youtube) *No registration is required
  • LANGUAGE: English (no interpretation to Japanese)
  • CONTACT: Koichi Omori, World Bank Tokyo Office 
  • komori@worldbankgroup.org