Skip to Main Navigation
Results Briefs October 21, 2020

Water for Lesotho’s Lowlands: Metolong Dam and Water Supply Program


The World Bank-funded Metolong Dam and Water Supply Program has enhanced lives at the grass-root level in Lesotho. It brought water to the country’s lowlands and boosted the economy by supplying domestic and industrial water. It has also improved the quality of life in rural areas by electrifying villages and providing skills training and healthcare to the communities in the project area. By the end of 2018, more than 500,000 people are reaping the benefits of the program, including employment opportunities, capacity building, and skills development.

Challenge

The Kingdom of Lesotho has an abundance of water in its mountainous areas. However, in the early 2000s in the country’s lowlands, where most of its population lives, water availability was an acute problem. Shortage of water, especially in the dry season, meant that people in the lowlands would have no water for months.

Lesotho’s export earnings largely come from the garment industry. Water and wastewater services are essential for these companies to thrive and continue making a significant contribution to the country’s economic output. The entire industry accounts for half of all water consumed in Maseru, and the lack of water and wastewater infrastructure presented a major impediment to continued growth. With climate change exacerbating already frequent droughts, and with increasing urban populations demanding more water, securing water supply was critical for Lesotho and its further socio-economic development.

Approach

Since 1983, the Lesotho Water Sector Improvement Project, (Phase II), an Adaptable Program Loan, is part of a long-term World Bank support program for Lesotho’s water sector, which was initiated in the late 1990s and approved in 2004.  The program was designed to first address institutional weaknesses in the country’s water sector and improve urban service delivery under Phase I, and then support increased water supply under Phase II.

Phase II of the program sought to support the Metolong Dam and Water Supply program and ensure that the construction of the Metolong Dam and downstream bulk conveyance followed an environmentally sound, socially responsible, and financially viable framework. The program also set out to provide support to institutional capacity building activities.

In the long run, the project was designed to support the Sustainable Development Goals by significantly improving access to clean water supply and bridging the infrastructure gap. Additional water supply to Lesotho’s lowlands was expected to reduce concerns of inadequate water resources for the country’s growing industry and attract private investments to expand industrial activities.

Results

By the end of 2018, key results include:

  • The project constructed 24 kilometers (km) of pipeline connecting the Metolong Dam and Teyateyaneng, bringing water and improving quality to more than 30,000 of Teyateyaneng’s citizens, of which 60 percent are women.
  • Three hundred people in the affected communities were provided with capacity building and income-generating skills, along with compensation.
  • Intensive livelihood restoration training of the two affected communities of Ratau and Motanasela was conducted, covering livelihood activities such as poultry, piggery, value chain, group dynamics conflict resolution, and social cohesion. Both communities established trust funds managed by the Standard Lesotho Bank to continue to support the program.
  • Affected communities benefitted from improved an HIV/AIDS management program. HIV testing increased by 38 percent, and counseling enrollment increased from 25 percent at the beginning of the project to 63 percent at its midterm.
  • The project provided water supply and electrified 80 villages in the project area
  • Through the Environmental and Social Management Plan, the project helped identify ways to benefit the community and ensure the environmental sustainability of the project.
  • The project benefitted from the Cultural Resources Management and Development Plan that helped to preserve the Southern Phuthiatsana subregion, home to over 30 cultural heritage sites.
  • Over 400 improved community water points were constructed or rehabilitated under the project, benefitting more than 25,000 people.
  • The project supported the implementation of the Water and Sanitation Policy of 2007 and the Water Resources Act of 2008 and other critical policy measures that helped strengthen Lesotho’s water sector.

Image
500,000 people

benefitted from water access, boosting local economy through domestic and industrial water supply.


Bank Group Contribution

The World Bank, through IDA, financed the project, funding US $49.5 million.

Partners

The Metolong Dam and Water Supply program was funded by multiple partners including the World Bank, the African Renaissance and International Cooperation Fund of the Republic of South Africa, the European Investment Bank, the Saudi Development Fund, OPEC Fund, Kuwait Fund, Arab Bank for Economic Development in Africa, Abu Dhabi Fund for Development, and the Millennium Challenge Corporation.  The Government of Lesotho also contributed $6.8 million.

The World Bank worked closely throughout project implementation with numerous national counterparts, including the Ministry of Natural Resources, the Ministry of Natural Resources, Metolong Authority, the Commissioner of Water and the Lesotho Highlands Development Authority.

Moving Forward

The new 83-meter high Metolong Dam  now  provides water to two-thirds of the country’s population in Lesotho. The industrial and domestic water supply promises to boost employment by creating more textile industry jobs and helping the country become economically self-reliant. The Government of Lesotho also replicated the framework design and extended it to other river basins within Lesotho.

In May 2019, the World Bank approved a new IDA credit worth US $ 78 million to increase water availability and access to improved water supply services in two priority zones of the country, and to improve technical and financial performance of the Water and Sewerage Company of Lesotho (WASCO).

Beneficiaries

“We have provided up to 10,000 employment opportunities locally. And our company relies on water a lot. Without water we would not have the finished product at all. So with this new reservoir project completed, I am sure the company is going to have more stable water flow”  - Ricky Chang, Admin Manager of Formosa Textile Company

 


image
Image

The new 83-meter high Metolong Dam is now open in Lesotho, providing water to two-thirds of the country’s population. Photo Credit: Zandile Ratshitanga, World Bank Group