IBRD Loan: $145.5 million equivalent
Terms: Maturity = 19.5 years; Grace period = 4 years
Project ID: P160911
Project description: The project will improve availability of water supply in drought vulnerable areas, increase the efficiency of Water Utilities Corporation, and strengthen wastewater management in selected systems..