IBRD Loan: US$133.41 million
TERMS: Grace period = 5 years; Maturity = 15 years
PROJECT OBJECTIVE: The objective of the project is to benefit the local population by providing safe drinking water and collection and treatment of wastewater. Project activities will also ensure the safety of the population and property through the implementation of adequate flood protection measures.