The objective of the assignment is to provide a detailed techno-economic analysis of selected locations on their capacity to evacuate 50MWp of Solar energy to ringfenced anchor loads in the distribution companies. The locations shall be 132kV grid substations within Transmission Company of Nigeria (TCN) grid which have outgoing 33kV networks. The studies would seek to assess if the locations are technically capable to evacuate the expected additional RE to reach its demand location; while holding the electrical parameters within expected ranges all through both transmission and distribution pathways.