Skip to Main Navigation

"Nigeria: Variable Renewable Energy (VRE) Integration and Evacuation Studies"


  • SOLICITATION NUMBER: 0002014486
  • INSTITUTION:  IBRD/IDA
  • ASSIGNMENT LOCATION: Nigeria
  • ISSUE DATE AND TIME: Mar 28,2025 14:28
  • CLOSING DATE AND TIME: Apr 24,2025 23:59

The objective of the assignment is to provide a detailed techno-economic analysis of selected locations on their capacity to evacuate 50MWp of Solar energy to ringfenced anchor loads in the distribution companies. The locations shall be 132kV grid substations within Transmission Company of Nigeria (TCN) grid which have outgoing 33kV networks. The studies would seek to assess if the locations are technically capable to evacuate the expected additional RE to reach its demand location; while holding the electrical parameters within expected ranges all through both transmission and distribution pathways.

The World Bank Group reserves the right to publicly disclose contract award information, including but not limited to, name of company receiving the award, brief description of services, and contract award amount, for any contract award valued over US$250,000. Offeror's proposal and contractual documents will remain confidential and therefore not subject to disclosure.

The World Bank Group values supplier diversity and encourages businesses owned by women, minorities, lesbian, gay, bisexual and transgender (LGBT) individuals, and people with disabilities to participate in this opportunity. Please indicate in the response if you meet one of these diverse categories and specify the certification body you utilize.

The World Bank reserves the right to reject any or all responses without recourse.

Welcome